Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the nggallery domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/13/d246318647/htdocs/wp-includes/functions.php on line 6121
No. 3rd Fronting Buildings Study – City of Richmond | Metis Design | Build

No. 3rd Fronting Buildings Study – City of Richmond

CONSULTANT WITH: IBI Group

THIS EXTENSIVE study involved a detailed urban design analysis and development proposal for No. 3 Road in anticipation of the construction Canada Line Skytrain guideway.